Siltech ® Solid
Surface Windowsills Installation
Instructions
Step 1 - Preparation
- Window Sill Opening must be free of dirt, dust, water, etc.
- Dry Wall must be cut level to bottom of window frame
Step 2 - Measuring
- Measure Window opening length
- Take measurement at rear and front of opening
- Cut windowsill to smaller of two measurements
- Option: If tabs/ears are selected add 1 ½” to each side of
the sill. (3) Inches more than the window opening
Step 3 – Reveal (Ripping sill may not be needed if
sill tucks under window frame)
- To obtain same reveal on both sides of windowsill, measure from window
to corner bead on each side (Add amount of reveal desired to this measurement).
- If measurements on both sides are the same, rip sill accordingly.
- If return depths are different on each side, scribe cutting is recommended
(This involves marking to measures on the sill, and marking a line to cut
on as a guide).
Step 4 – Setting the Windowsill (against frame)
- If the windowsill is to be set against the window frame, use plastic shims
where needed to make level.
- Be sure that the windowsill is level before using adhesive.
- Once the windowsill is level add liquid nail / QB-300 over shims.
- Set windowsill, check to make sure the windowsill is still level.
- Some installations may require a cleat under the lip of the windowsill
until adhesive is set.
- Adhesive usually dries within 24-48 hours
Step 4 – Setting the Windowsill (tucking
under frame, on concrete block or pre-cast only)
- Use a thin set floor mortar, making sure that consistency is not wet or
to dry.
- Run a bead of adhesive onto concrete block.
- Place a dollop or scoop of cement every 12” – 16” apart
on top of adhesive.
- Run a bead of adhesive on backside of windowsill.
- Tuck back of windowsill under the window frame.
- Tap front of sill down until level, keeping back of sill against frame.
- Clean any mortar that may have come out from under front edge of sill.
- Check windowsill for final level.
- Let dry for 24-48 hours
- Place stacks of shims until sill is raised up to
window frame.
- Put liquid nail over top of shims making sure liquid nail also
is on wood framing.
- Place sill back in opening and then level front to back
with cleat if needed.
Do not remove blue tape for at least 4 days for all adhesives to cure properly
- Adhesive recommended – OSI QB-300 pro series Multipurpose construction
adhesive
- CRL – Shim stack Shims CAT. # KRS16 – 1-800-262-3299
|