Siltech ® Solid Surface Windowsills Installation Instructions

Step 1 - Preparation

  • Window Sill Opening must be free of dirt, dust, water, etc.
  • Dry Wall must be cut level to bottom of window frame

Step 2 - Measuring

  • Measure Window opening length
  • Take measurement at rear and front of opening
  • Cut windowsill to smaller of two measurements
  • Option: If tabs/ears are selected add 1 ½” to each side of the sill. (3) Inches more than the window opening

Step 3 – Reveal (Ripping sill may not be needed if sill tucks under window frame)

  • To obtain same reveal on both sides of windowsill, measure from window to corner bead on each side (Add amount of reveal desired to this measurement).
  • If measurements on both sides are the same, rip sill accordingly.
  • If return depths are different on each side, scribe cutting is recommended (This involves marking to measures on the sill, and marking a line to cut on as a guide).

Step 4 – Setting the Windowsill (against frame)

  • If the windowsill is to be set against the window frame, use plastic shims where needed to make level.
  • Be sure that the windowsill is level before using adhesive.
  • Once the windowsill is level add liquid nail / QB-300 over shims.
  • Set windowsill, check to make sure the windowsill is still level.
  • Some installations may require a cleat under the lip of the windowsill until adhesive is set.
  • Adhesive usually dries within 24-48 hours

Step 4 – Setting the Windowsill (tucking under frame, on concrete block or pre-cast only)

  • Use a thin set floor mortar, making sure that consistency is not wet or to dry.
  • Run a bead of adhesive onto concrete block.
  • Place a dollop or scoop of cement every 12” – 16” apart on top of adhesive.
  • Run a bead of adhesive on backside of windowsill.
  • Tuck back of windowsill under the window frame.
  • Tap front of sill down until level, keeping back of sill against frame.
  • Clean any mortar that may have come out from under front edge of sill.
  • Check windowsill for final level.
  • Let dry for 24-48 hours
  • Place stacks of shims until sill is raised up to window frame.
  • Put liquid nail over top of shims making sure liquid nail also is on wood framing.
  • Place sill back in opening and then level front to back with cleat if needed.

Do not remove blue tape for at least 4 days for all adhesives to cure properly

  1. Adhesive recommended – OSI QB-300 pro series Multipurpose construction adhesive
  2. CRL – Shim stack Shims CAT. # KRS16 – 1-800-262-3299

 

Siltech Windowsills


Products Product Features Portfolio Siltech® Company  Trade Shows What's New Fillet A Way - Fish Cleaning Table
Windowsills New Products Product Comparison Projects Clients Contact Home Siltech® Brochure & Comparison flyer
Order Products Door Sills / Transition Pricing Windowsills Pricing Curb Cap Pricing Wall Cap Pricing Windowsills and Products Pre- Cut Pricing Fillet-A-Way™ - Fish Cleaning Table Pricing

Siltech Acrylic Window Sills - Solid Surface Window Sills Naples Florida

Siltech® Inc.
• 1881 Trade Center Way Naples, FL  34109 •
phone: 239.593.7988 • fax: 239.593.7983

Designed and developed by
web design and development by  IMAGUN
IMAGUN Web Design Naples Florida
Copyright © All Rights Reserved 2004 - 2008